摘要
针对FIDIC合同条件的不同版本(银皮书和红皮书)的不同情况下承包商在工程定价和索赔环节采取的不同对策作了分析,指出承包商在不同的合同版本下应该采取灵活而有针对性的策略来维护自己的权益。
According to different situations of the different versions of FIDIC contract terms(silver book and red book),this paper analyses different countermeasures adopted in the pricing and claim link of an engineering by contractor,and points out that the contractor should take flexible and targeted strategy to protect their own rights under the condition of different contract versions.
出处
《中国港湾建设》
北大核心
2010年第6期74-77,共4页
China Harbour Engineering
关键词
银皮书
红皮书
索赔
定价
对策
silver book
red book
claim
pricing
countermeasure