鲁布革水电站是我国水电系统第一个实行国际招标、采用了一系列先进技术、在管理上引进竞争机制的水电工程。第一台机组已于1988年12月发电,第二台机组于1989年9月投产。本文介绍了鲁布革水电工程的设计、建设和管理的基本经验,作者对这些经验做了评价。
Lubuge Hydroelectric Station is the first project which has adopted the international tendering system in Chinese hydropower construction and practised a series of new technology and management featured for high competition.The first generating set has begun its normal work in December 1988, and the second set in September 1989. The paper gives a general review and analysis of the main achievements and advanced experiences gained at this construction.