摘要
介绍了生物脱酚废水处理系统存在的问题,通过改造工艺,扩大了浮选厌氧吸水井的容积,解决了出水指标偏高的问题;通过创新工艺,探索出剩余污泥的处理方法,并在应用中取得良好效果。
The problems existing in the wastewater system for biological dephenolization system are described.Through the modification of process,the volume of flotation anaerobic water absorption well is expanded and the problem of the high index of discharged water is solved.The excess sludge disposal process is explored by creating new process and good result is obtained in application.
出处
《燃料与化工》
2011年第1期46-47,共2页
Fuel & Chemical Processes
关键词
生物脱酚
调节池
剩余污泥
Biological dephenolization Regulating tank Excess sludge