摘要
蒲石河抽水蓄能电站,位于辽宁省宽甸满族自治县境内,是我国东北在建中的第一座大型纯抽水蓄能电站,总装机容量为1 200 MW。输水系统金属结构设备主要布置在上水库进/出口、尾闸室、下水库进/出口等3个部位。本文着重介绍了金属结构设备的布置与选型,以及主要设计原则和成果。
Pushihe pumped storage power station,located in the Kuandian man nationality autonomous county of Liaoning province,is the first large-scale pure pumped storage power station under construction in northeast China,with a total installed capacity of 1200MW.The metal structure equipment of water conveyance system is arranged in the import and export of the upper reservoir,the tail sluice chamber and the import and export of the lower reservoir.The paper emphatically introduces the layout and selction of the metal structure equipment and the main design principles and achievements.
出处
《东北水利水电》
2011年第1期16-18,71,共3页
Water Resources & Hydropower of Northeast China
关键词
抽水蓄能电站
输水系统
闸门
拦污栅
启闭机
pumped storage power station
water conveyance system
gate
trash rack
hoist