摘要
从工程实际出发,进行了两种方案水力学计算、结构计算、施工方法、施工工期以及投资成本等方面的比较,得出合理结论。
Embarked actually from the project, carries on two kind of plan hydraulics calculates, structure calculates, aspect and so on job practice, construction time as well as cost of investment comparisons, drew the reasonable conclusionn.
出处
《煤炭技术》
CAS
北大核心
2011年第1期128-130,共3页
Coal Technology
关键词
压力管道
钢筋混凝土衬砌
钢板衬砌
pressure pipeline
reinforced concrete lining work
steel plate lining work