LNG接收站蒸发气处理系统静态设计计算模型 被引量:45

A static-design calculation model of boil-off gas(BOG) handling system of an LNG receiving terminal
下载PDF
导出
摘要 BOG(Boil-Off Gas)系统是LNG接收站设计阶段中必须重点考虑的关键问题之一。与大型LNG液化工厂中主要考虑BOG提供燃料气和LNG装船工况下BOG直接通过火炬燃烧情况完全不同,LNG接收站设计中则应结合气化外输压力、最小外输流量等不同项目特点,对于BOG的回收、处理和利用有更多的选择。为此,按照LNG接收站卸船和非卸船两种基本工况划分,对设计阶段保守估算BOG产生量引入完整的静态计算方法,通过实例计算,提出了BOG压缩机的合理配置方案,以期实现技术与经济两方面的优化。该计算方法对于国内自主进行LNG接收站的设计具有参考意义,对于小型LNG卫星站的设计亦有借鉴意义。 The boil-off gas(BOG) handling system is one of the key issues at the design stage of a LNG receiving and re-gasification terminal.Different from such cases that the BOG can be recovered as a fuel gas in a large-scale LNG plant or that the BOG can only be vented for faring in loading conditions,the sending-out pressure and the minimal flowing rate,etc.,should be taken into consideration at the design stage of a LNG receiving terminal so that more options will be provided for the recovery,treatment and utilization of BOG.According to two basic conditions of LNG unloading and non-unloading at a terminal,we hereby conservatively calculated the quantity of the possibly produced BOG by introducing an integrative static-design method.Besides,through example calculation,we made a reasonable arrangement proposal for the BOG compressors so as to realize both technical and economic optimization of a LNG terminal.This calculation method is of great significance in independent designing of LNG terminals and small-scale LNG satellite-stations in China.
作者 付子航
出处 《天然气工业》 EI CAS CSCD 北大核心 2011年第1期83-85,116-117,共3页 Natural Gas Industry
关键词 LNG 接收站 储罐 BOG 设计 计算 模型 LNG,receiving terminal,tank,boil-off gas(BOG),design,calculation,model
  • 相关文献

参考文献9

二级参考文献27

  • 1李佩铭,焦文玲.液化天然气工业链与国际贸易[J].煤气与热力,2006,26(12):33-36. 被引量:10
  • 2初燕群,陈文煜,牛军锋,刘新凌.液化天然气接收站应用技术(Ⅰ)[J].天然气工业,2007,27(1):120-123. 被引量:68
  • 3LT. CMDR. MARK HAMMOND. Cove Point risk assessment[J]. Proceedings, 2005,62 (3) : 87-91.
  • 4STILES R E. Imported LNG to serve East Coast utilities [J]. Pipeline Industry, 1974,40 ( 1 ) : 48-50.
  • 5PERAINO J, CHASE B L, PLODOWSKI T, et al. LNG: From Ship to Shore[C]. Houston: OTC,1976,1119-1127.
  • 6P&GJ STAFF. 6000-ft tunnel, LNG unloading facility unique aspects of Cove Point terminal[J]. Pipeline and Gas Journal,1975,202(7) :60,62,66.
  • 7NISHIKIORI MINORU, MORI YOiCHI, KASAHARA SHINICHI. The startup of the latest LNG base. Oogishima factory in Tokyo Gas[J]. Piping Engineering, 1999,41 ( 7 ) : 15-22.
  • 8ISAYAMA TERUHIRO, KATO TOSHIHIRO. Construction report for LNG receiving terminal of Tokyo Gas Ohgishima[J]. NKK Technical Report, 1999,167 : 56-61.
  • 9BP Statistical Review of World Energy June 2009 [EB/ OL].[2009-11-11]. http: //www. bp. com/statisticalreview.
  • 10経済產業省資源ェネルキ一庁.平成20年度ェネルギ一に関する年次報告書(ェネルキ一白書)[R].東京:経済產業省,2009.

共引文献51

同被引文献260

引证文献45

二级引证文献242

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部