深圳市滨河污水处理厂改造工程 被引量:7

Reconstruction Project of Shenzhen Binhe Sewage Treatment Plant
原文传递
导出
摘要 介绍了深圳市滨河污水处理厂改造工程的特点和要求。该厂降低了原有三期工程的处理规模并对部分构筑物进行改造,新建18×104 m3/d的常规处理构筑物及30×104 m3/d的深度处理工程。工程改造后出水水质基本达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。 The characteristics and requirements of reconstruction project of Shenzhen Binhe Sew- age Treatment Plant are introduced. The treatment capacity of the original third-phase project was re- duced, part of structures were reconstructed, and conventional treatment buildings of 18 x 104 m3/d and advanced treatment buildings of 30 x 104 m3/d were newly constructed. After the reconstruction, the ef- fluent quality meets the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002).
出处 《中国给水排水》 CAS CSCD 北大核心 2011年第2期82-86,共5页 China Water & Wastewater
关键词 污水处理厂 A2/O工艺 微絮凝深度处理 技术改造 sewage treatment plant A2/O process miero-floeeulation advanced treatment technical reconstruction
  • 相关文献

参考文献5

二级参考文献3

共引文献13

同被引文献41

引证文献7

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部