广州珠江新城西塔432m高空重型塔式起重机拆除技术 被引量:2

Hercules Crane Demolition Technique at 432m Altitude in Guangzhou Pearl River New Town West-tower
下载PDF
导出
摘要 重型塔式起重机屋面拆除是目前国内超高层施工中必须考虑的问题。结合珠江新城西塔M900D重型塔式起重机的拆除方法及拆除过程,提出了相关重型塔式起重机高空拆除的施工思路及要点。介绍了施工工艺,并对拆除塔式起重机基础进行了力学分析。在拆除过程中,拆除设备的布置应相对集中,拆除设备基础与结构的连接应尽量位于结构的强点,基础构件应选用箱形截面。 Demolition of hercules crane must be considered in super high-rise building construction.Based on the demolition method and process of MD900 hercules crane in Guangzhou Pearl River New Town West-tower,key points of high altitude demolition are proposed,and construction technique is introduced.Mechanical analysis of the demolition equipment basement is made.The engineering practice shows that layout of demolition equipment should be centralized on,joints of base of demolition equipment and structure should be located on strong parts,basement component should be box section.
出处 《施工技术》 CAS 北大核心 2011年第1期67-69,共3页 Construction Technology
关键词 重型塔式起重机 高空拆除 力学分析 基础 hercules crane high altitude demolition mechanical analysis basement
  • 相关文献

参考文献6

二级参考文献12

共引文献140

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部