摘要
介绍了发电站55 MW汽轮机组快速冷却装置的介质选择、工作原理,以及其运行注意事项。运行实例表明,该机组应用快速冷却技术后,冷却时间大大缩短,由72h缩短为30.33h,具有显著的经济效益。
Medium selection,working principle as well as points for attention in operation of rapid cooling device of 55MW turboset for the power station are introduced.The running example indicates that after application of the rapid cooling technology,cooling time of the turboset has reduced from 72h to 30.33h.It has significant economic benefits.
出处
《冶金动力》
2011年第1期50-52,共3页
Metallurgical Power
关键词
汽轮机
快速冷却技术
应用
steam turbine
rapid cooling technology
application