摘要 介绍了AASHTO 2002力学经验法设计指南中的永久变形叠加方法,在考虑应力历史、路面温度和荷载作用次数等因素的基础上,通过APA试验进行各种工况下的永久变形叠加模拟.提出以实测永久变形值与AASHTO叠加变形值之比作为AASHTO修正系数,明确了影响R主要因素包括前一个子季节的路面温度T1和永久变形D1、当前子季节的路面温度T2载作用次数N2;最终采用指数方程的形式建立了基于AASHTO 2002的永久变形叠加方程. Firstly,superposition method of permanent deformation of asphalt pavement in AASHTO 2002 design guide was introduced briefly.Secondly,experiments simulations were performed using APA(asphalt pavement analyzer) with stress history,pavement temperature and number of loading cycles considered;Thirdly,the ratio(R) of permanent deformation measured by APA and superposed by AASHTO 2002 design guide was proposed to correct superposition method of permanent deformation in AASHTO 2002 design guide.Influencing factors of were determined and included pavement temperature of last subseason(T1),permanent deformation at the end of last subseason(D1),pavement temperature of current subseason(T2) and number of load cycles of current subseason(N2).Modified AASHTO equation was founded using exponent equation and coefficients were regressed using least square method.
出处 《武汉理工大学学报(交通科学与工程版)》 2010年第6期1095-1099,共5页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 国家自然科学基金项目(批准号:51008099) 中国博士后科学基金项目(批准号:20100471025) 高等学校博士学科点专项科研基金项目(批准号:20080213011)资助
关键词 沥青路面 永久变形叠加方法 路面温度 APA 试验模拟 AASHTO 2002设计指南 asphalt pavement superposition method of permanent deformation pavement temperature asphalt pavement analyzer test simulation AASHTO 2002 design guide
  • 相关文献

参考文献5

  • 1曹丽萍,董泽蛟,孙立军.从温度分布频率探讨沥青路面的永久变形[J].同济大学学报(自然科学版),2007,35(12):1617-1621. 被引量:14
  • 2NCHRP.Guide for mechanistic-empirical design of new and rehabilitated pavement structures final report[R].Washington,D.C.,AASHTO,2004.
  • 3American Association of State Highway Transportation Officials.Standard method of test for determining rutting susceptibility of asphalt paving mixtures using the asphalt pavement analyzer.AASHTO Designation:TP63-03[S].Washington D C:[s.n.] ,2003.
  • 4曹丽萍,孙立军,董泽蛟.沥青混凝土路面分析仪APA的发展与应用[J].公路,2007,52(3):1-6. 被引量:8
  • 5Pavement Technology INC.Asphalt pavement analyzer user's guide[EB/OL].[2003-03-28].http://www.pavementtechnology.com/ manuals/APAManual.pdf.

二级参考文献34

  • 1彭妙娟,许志鸿.沥青路面车辙预估方法[J].同济大学学报(自然科学版),2004,32(11):1457-1460. 被引量:41
  • 2邵腊庚,刘亮,李闯民.APA沥青混合料高温浸水车辙试验研究[J].中南公路工程,2005,30(4):70-73. 被引量:8
  • 3Randy C West.Gale Page and Kenneth Murphy.Evaluation of the Loaded Wheel Tester[R].Research Report FL/DOT/SMO/91-391,State of.Florida Department of Transportation,1991.
  • 4Anthony D M.Laboratory Investigation of the Rutting Characteristics of ODOT's Asphalt Mixes[D].Master of Science,University of Cincinnati,1992.
  • 5James S Lai.Results of Round-Robin Test Program To Evaluate Rutting of Asphalt Mixes Using Loaded Wheel Tester[J].In Transportation Research Record 1417,TRB,Washington,D.C.,1993.
  • 6Brad Young.Evaluation of Large Stone Hot Mix Asphalt(LSM)[R].GDOT Research Project 9101,Georgia Department of Transportation,1994.
  • 7T Miller,K Ksaibati,M Farrar.Utilizing the Georgia Loaded-Wheel Tester to Predict Rutting[A].Annual Meeting of the Transportation Research Board[C].Washington,D.C.,1995.
  • 8Collins R,Watson D,Campbell B.Development and Use of the Georgia Loaded Wheel Tester.[J].In Transportation Research Record 1492,TRB,National Research Council,Washington,D.C.,1995,(7).
  • 9Collins R,Shami H I,James S Lai.Use of Georgia Loaded Wheel Tester to Evaluate Rutting of Asphalt Samples Prepared by Superpave Gyratory Compactor[J].In Transponation Research Record 1545,TRB,National Research Couneil,Washington,D.C.,1996.
  • 10Haroon Shami,Evaluating Permanent Deformation in Asphalt Concrete Using Georgia Loaded Wheel Tester[D].Doctor of Philosophy,Georgia Institute of Technology,1996.

共引文献19

同被引文献26

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部