摘要
通过对采场结构参数与回采顺序调整、采场内点柱留设以及强化现场管理,对下垄钨矿左拔矿区围岩破碎及矿脉密集采场回采进行了现场试验研究,安全高效地回收了矿山资源,取得了较好的经济效益。
This paper studies the stoping technology in the rock-broken and vein-intensive stope of Zuoba mining region by adjusting structural parameters and mining sequence,leaving ore pillar points and improving stope management.The mining resources are recovered safely and efficiently with favorable economic benefits.
出处
《中国钨业》
CAS
2010年第6期12-14,共3页
China Tungsten Industry
关键词
矿脉密集
采场结构
回采顺序
点柱留设
concentrated veins
stope structure
mining sequence
leaving of pillar point