摘要
介绍河北国华定洲发电有限责任公司2台660MW超临界机组协调控制系统结构,分析该机组协调控制策略的特点和难点,针对机组试运行期间协调控制系统存在的问题进行优化处理,为机组的安全、经济运行提供了可靠保证。
This paper introduces the constitutions of coordinated control system of Guo Hua Ding Zhou two 660MW supercritical units,analyzes the characteristics and the difficulties control system,optimizes and settles the problem of coordinated control system during debugging of unit,to get the reliability guarantee for safety and economy of unit operation.
出处
《河北电力技术》
2010年第6期18-20,共3页
Hebei Electric Power
关键词
超临界机组
协调控制系统
控制策略
大延迟
热工自动调节
supercritical unit
coordinated control system
control strategy
large delay
thermal-automatic integration