摘要
介绍国电浙江北仑第三发电公司三期扩建工程1000MW超超临界锅炉各区域的保温施工工艺,针对该施工工艺存在的问题进行分析,并提出处理措施,解决了锅炉大罩壳顶部超温问题。
This paper introduces the construction technics for the wall of 1 000MW ultra-supercritical boiler which is in Guodian Beilun No.3 Power Generation Co.Ltd.,analyzes and settles the problems in the construction technics,and raises the settlement measures,to handle the ultra-temperature problem on boiler hood top.
出处
《河北电力技术》
2010年第6期50-51,共2页
Hebei Electric Power
关键词
超超临界锅炉
保温
施工工艺
ultra-supercritical boiler
heat preservation
construction technics