摘要
介绍了世博会南市电厂主动式导光系统的原理,提出了一种技术可行、成果可靠的主动式导光系统施工方案.
Through introducing the Active Light System in Nanshi Power Plant,a technically feasible and reliable technological achievement of the active optical system construction method is provided.
出处
《上海电力学院学报》
CAS
2010年第6期550-554,共5页
Journal of Shanghai University of Electric Power