摘要
杭州市江东大桥位于钱塘江强涌潮河段,桩基采用大直径超长钻孔灌注桩,持力层为极软岩,桩底采用后压浆技术。对杭州市江东大桥主桥桩基的设计作了简要介绍,对桩基持力层的选择、单桩承载力的确定等有关问题进行了探讨,并介绍了主要计算结果。
Jiang Dong Bridge is located in strong-tidal aera of Qiantang River in Hangzhou city,The ultra-long bored piles with large diameter are adopted for the ultra soft support earth layer with the post-grouting technology.The design of pile foundation of the main bridge was introduced,the choice the bearing stratum,the determination of the bearing capacity and the main calculation results are discussed.
出处
《上海公路》
2010年第4期39-42,共4页
Shanghai Highways
关键词
钻孔灌注桩
持力层
后压浆
试桩
围堰
Bored pile
Bearing strata
Post-grouting
Pile test
Cofferdam