以裂解气压缩机的安装为例,结合中国石油抚顺石化公司扩建80万t/a大乙烯工程"三机"的安装实践,对比以前的无垫铁安装方法,总结了大型机组在安装时采用滑板式无垫铁安装的施工工艺和优点。
According to CNPC Fushun Petrochemical Company's expansion of 800,000 tons/year Ethylene project compressors installation practice,the paper mainly takes Cracked Gas Compressor installation as an example,it compares it with the former method of No Shim Installation.This paper introduces the construction process and advantages of installing large unit by using Sliding Type No Shim method.This also gives remarkable reference for future large equipments installation.
出处
《承德石油高等专科学校学报》
CAS
2010年第4期33-35,44,共4页
Journal of Chengde Petroleum College
关键词
大型机组
调整螺栓
临时垫板
滑动垫板
large units
adjusting bolt
temporary pad plate
sliding pad plate