摘要
对广东省佛山市良马大涌的现况条件和佛山市公路一环的规划条件进行了分析,提出了良马大涌改线工程设计的方法,为良马大涌肩负引水和排涝的作用奠定了理论基础。
The paper analyzes the current condition for Liangmadayong in Foshan city of Guangdong and the planning conditions for the first ring of Foshan city,and points out the methods for the diversion project design for Liangmadayong,so as to lay the theoretic foundation for playing the role of water diversion and storm drainage.
出处
《山西建筑》
2011年第5期231-232,共2页
Shanxi Architecture
关键词
引水
排水
改线工程
water diversion
drainage
diversion project