非线性关系下的工程项目工期—成本—质量综合优化 被引量:18

Optimization of time-cost-quality under non-linear relationship in construction project
下载PDF
导出
摘要 工期、成本和质量是工程项目管理的主要内容,三者相互依存、相互影响,需要综合考虑。将工程项目间接成本和提前投产效益的上下限平均分摊到各工程活动中,构建各工程活动综合成本与持续时间之间、工程活动质量与持续时间之间的非线性关系,利用多属性效用函数理论建立项目工期—成本—质量综合优化模型,并用遗传算法求解。最后通过案例说明本文的优化模型不仅有效缩短了项目工期,还降低了项目成本,提高了工程质量。 Time,cost and quality are main aspects in construction project management.They must be considered togather because they are interdependent and mutual influence.This paper allocated the maximum and the minimum of project indirect cost and benefit ahead of schedule to each activity which made up the project.It constructed the non-linear relationship between activity cost and duration,and between quality and duration,and established the time-cost-quality integrated optimization model using multi-attribute utility function theory,and solved the model with genetic algorithms.At last,a case study proves that the model can shorten the time,reduce the cost and improve the quality of construction projects as well.
出处 《计算机应用研究》 CSCD 北大核心 2011年第2期580-583,共4页 Application Research of Computers
基金 大型水电开发工程供应链多级计划协同优化问题研究资助项目(2009CDB242)
关键词 工程项目管理 综合优化 多属性效用函数 非线性 遗传算法 construction project management integrated optimization multi-attribute utility function non-linear genetic algorithms
  • 相关文献

参考文献7

二级参考文献21

  • 1刘晓峰,陈通,张连营.基于微粒群算法的工程项目质量、费用和工期综合优化[J].土木工程学报,2006,39(10):122-126. 被引量:40
  • 2玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 3Babu A J G,Suresh N.Project management with time cost and quality considerations[J].European Journal of Operational Research,1996,88(2):320-327.
  • 4《运筹学教材编写组.运筹学[M].北京:清华大学出版社,1990.
  • 5朱兰J M.质量控制手册编译组译.质量管理手册[M].上海:上海科学技术出版社,1979.
  • 6Tarek Hegazy,Member,ASCE,Nagib Wassf.Cost Optimization in Project with Repetitive Nonserial Activities[J].Journal of Construction Engineering and Management,2001,12 (2),181-191.
  • 7Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 8Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 9Babu A J G,Suresh N.Project management with time,cost and quality considerations[ J ].European Journal of Operational Research,1996,88(2):320-327.
  • 10Liem Tran,Lucien Duckstein.Comparison of fuzzy numbers using a fuzzy distance measure[ J ].Fuzzy Sets and Systems,2002,130:331-341.

共引文献188

同被引文献115

引证文献18

二级引证文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部