摘要
为应对西电东送输电网建设投资与经营压力,分析了融资租赁方式引入西电东送输电网建设项目中的可行性,构建了融资租赁收益计算模型,并分别建立了融资租赁方式与贷款方式的收益净现值计算模型,对比分析了两者收益。实例结果表明,该模型具有可操作性。
In response to the pressure of investment and operation in West-East electricity transmission grid construction project,the feasibility of introducing finance leases into electricity transmission grid construction project is analyzed and a finance leases profit model is established.And the net present value of benefits models of finance leases and loans are established and it is comparative analysis.The empirical results indicate that the models are operable.
出处
《水电能源科学》
北大核心
2011年第2期174-177,共4页
Water Resources and Power
关键词
西电东送
输电网建设
融资租赁
决策
净现值
West-East electricity transmission project
grid construction
finance leasing
decision-making
net present value