摘要
天津新港地区首次建重力式码头,没有预制、溜放大型沉箱的条件,只能因地制宜。文章论述了天津港东突堤南侧矿建码头在施工中的空箱预制、清淤的几种方案、基床的抛石、夯实、基床整平和安装空箱等。
In the construction of gravity quay at Xingang District, Tianjin, there were no favorable conditions for precasting the big-scale caissons so we must take measures to suit the local conditions. This paper makes description in detail on the fabrication schemes of caissons,in-situ cleanup of siltation,the rubble tipping and ramming, foundation leveling, and installation of caissons for the ore terminal at the south side of East Mole of Xingang,
出处
《水运工程》
北大核心
1990年第10期40-44,共5页
Port & Waterway Engineering