摘要
文章在分析蛇口工业区挤淤填土造地的工程经验的基础上,找出填土高度和挤淤厚度之间的关系和规律,为这一经验的推广提供了宝贵的经验。
On the,,basis of analysis on the experience of reclamation work at Shikou industrial district by loading earth-fill on a silty layer in order to squeeze into the bottom soft soil, this paper gives the relation and general rules between the height of earth-fill and the thickness of silty layer. This experience is valuable for the construction of similar projects.
出处
《水运工程》
北大核心
1990年第12期36-38,共3页
Port & Waterway Engineering