摘要
甘谷电场位于湿陷性黄土分布区域,针对其地基基础处理方面的设计要求及施工中可能遇到的问题进行了探讨,并结合该工程实例,介绍了湿陷性黄土地基处理的有效方法,以及在工程设计、施工等方面应采取的技术措施。
Gangu power plant is lies in collapsed loess distract. It's design demand of groundwork and foundation treatment and the problems may be met during construction was discussed. Based on the real project, the effect treatment method of collapsed loess groundwork and the technical measures during engineering design and construction was introduced.
出处
《工程质量》
2011年第1期39-41,共3页
Construction Quality
关键词
电厂
湿陷性黄土
地基处理
措施
power plant
collapsed loess
groundwork treatment
measurement