1Johnson T B. Optimum open -pit mine production scheduling [D]. Berkeley: University of California,1968.
2Qinghuai H. Short -term production scheduling for open pit mines by PERT network with resource constraints[A]. Rai Singhal. Proceedings of the FourthInternational Symposium on Mine Planning and Equipment Seleetion [C]. Rotterdam: Balkema Calgary, 1995. 103 - 108.