摘要
三明钢铁厂将原先单独的转炉煤气回收系统与煤气管网并网,提高了转炉煤气回收利用率,缓解了燃气平衡缺口矛盾,降低了生产成本.
The original individual recovery system for converter gas was combined with gas pipe network in Sanming Steel Works. Therefore, recovery and utilization of converter gas are enhanced, contradictory of gas supply and demand for gas is moderated and production costs are decreased.
出处
《冶金动力》
1999年第5期33-35,共3页
Metallurgical Power
关键词
转炉煤气
回收利用
并网
技术改造
回收系统
converter gas, recovery and utilization, pipe network combination