摘要
介绍了马钢新建水处理站在试运行期间暴露的水量不平衡问题,从技术和管理的 角度提出对策。
Problems of unbalanced water amount during commissioning of the newly built water treatment station of Maanshan Iron & Steel Co. are presented. In the view of technique and management, countermeasures are proposed.
出处
《冶金动力》
1999年第5期64-66,共3页
Metallurgical Power
关键词
水处理站
水理平衡
循环率
供水
钢厂
newly built water treatment station, water amount balance, circu- lation rate