摘要
通过国道106线衡水市辖区L3标段大修工程中沥青路面现场冷再生技术的施工实践,详尽地阐述泡沫沥青道路冷再生基层的准备、施工、养护、检测等主要环节,证明该技术促进了旧路面材料的循环利用,对于减少污染、保持水土、以较少的投资修筑更多的公路具有重要意义,值得广泛推广应用。
According to the construction practice of site cold-recycled technology for the asphalt pavement of the overhaul engineering of State Highway No.106 Hengshui City L3 Contract Section,the main links,such as the preparation,construction,maintenance and testing of cold-recycled base course under foamed asphalt road are elaborated in detail.It is proved that this technology promotes the recycling of old pavement materials and has important significance for reducing pollution,preserving soil and water,constructing more highways with less investment.It deserves wide promotion and application.
出处
《交通标准化》
2011年第1期155-157,共3页
Communications Standardization
关键词
泡沫沥青
冷再生
施工
foamed asphalt
cold-recycled
construction