4Meena P, Rittidech S, Poomsa-ad N. Application of closed-loop oscillating heat-pipe with check vavles (CLOHP/CV) air-preheater for reduced relative-hu- midity in drying systems[J]. Applied Energy, 2007, (84) :553-564.
5Wan J W,Zhang J L,Zhang W M. The effect of heat pipe air-Handling coil on energy consumption in cen tral air-conditioning system[J]. Energy and Buildings 2007,39(9) : 1035-1040.