摘要
江苏路调蓄池是苏州河沿岸市政泵站雨天排江量削减工程中的主要内容之一。叙述了调蓄池土建工程施工中采用的基坑围护结构、坑底加固、基坑降水、基坑开挖及支撑、主体结构施工等技术措施。通过工程实践证明,调蓄池施工采用的技术措施是合理、有效的。
The storage pond of Jiangsu Rd.is a main part of municipal pumping station project along Suzhou Creek,which can decrease the discharge volume on raindays.Its technology measures are put forward including the foundation pit enclosure structure,strengthening the bottom of the pit,the dewatering,the excavating and supporting,the main structure construction,etc.It is proved to be reasonable and effective of these technology measures after the practical engineering project.
出处
《中国市政工程》
2010年第6期51-53,共3页
China Municipal Engineering
关键词
调蓄池
结构施工
基坑围护
土体加固
基坑降水
开挖支撑
storage pond
structure construction
enclosure foundation pit
soil body strengthened
foundation pit dewatering
excavation supporting