摘要 梯级水库短期优化调度的基本方法是首先采用动态规划方法按时间(以日为单位)规划三峡水库水位变化过程线,然后按日来进行优化调度,确定调度方案,建立一种以动态规划原理来解决梯级水库短期优化调度问题的数学模型。对于梯级水库短期优化调度,这种方法既考虑了面临时段的效益,又考虑了余留时期的效益,因此,据此制定的各时段的最优决策能够满足既定要求。 The Essential method of the Stave reservoir Short-term optimization attempering is using the dynamic programming method on time(take date as unit) to plan the Three Gorges reservoir water level change process line at first,Then daily carries on the optimized attempering daily,make certain the attempering scheme.The article proposed one kind of mathematical model to solve the stave reservoir short-term optimization attempering question by the dynamic programming.Regarding the stave reservoir short-term optimization attempering,this method both has considered the time interval benefit faced with,also had considered the rest time interval benefit,therefore according to the above formulates various time intervals most superior decision-making can satisfiedly decide the request.
出处 《廊坊师范学院学报(自然科学版)》 2010年第6期11-13,17,共4页 Journal of Langfang Normal University(Natural Science Edition)
关键词 梯级水库短期优化调度 动态规划 最优决策 short-term optimization attempering dynamic programming most superior decision-making
  • 相关文献

参考文献4

二级参考文献28

  • 1谢新民,陈守煜,王本德,周之豪,陈崇仁.水电站水库群模糊优化调度模型与目标协调-模糊规划法[J].水科学进展,1995,6(3):189-197. 被引量:10
  • 2张英贵.三峡—葛洲坝梯级水电厂日调节运行研究[J].武汉水利电力大学学报,1996,29(3):30-35. 被引量:3
  • 3朱敏,王定一.电力系统中梯级水电站实时优化运行控制新算法[J].电力系统自动化,1997,21(4):30-33. 被引量:21
  • 4王彩华 宋连天.模糊论方法[M].北京:中国建筑工业出版社,1998..
  • 5Guan X,Luh P B,Prasannan B.Power system scheduling with fuzzy reserve requirements[J].IEEE Transactions on Power Systems,1996,11(2):864-869.
  • 6Su C C, Hsu Y Y.Fuzzy dynamic programming:an application to unit commitment[J].IEEE Transactions on Power Systems,1991,6(3):1231-1237.
  • 7Miranda V, Saraiva J T.Fuzzy modeling of power system optimal load flow[J].IEEE Transactions on Power Systems,1992,7(2):843-849
  • 8Wang C,Shahidehpour S M,Adapa R.A fuzzy set approach to tie flow computation in optimal power scheduling[J].Proceedings of the 54th Annual Meeting of the American Power Conference,Chicago,Illinois,1992,(4):1443-1450.
  • 9Yan H,Luh P B,A fuzzy optimization based method for integrated power system scheduling and inter utility power transaction with uncertainties[J].IEEE Transactions on Power Systems,1997,12(2):756-763.
  • 10Wong K P,Suzannah,Yin Wa Wong.Combined genetic algorithm/simulated annealing/fuzzy set approach to short-term generation scheduling with take-or-pay fuel contract[J].IEEE Transactions on Power Systems,1996,11(1):128-136.

共引文献50