摘要
从国内塔式炉首次采用等离子点火到低温EDTA化学清洗,再到大流量氧化皮冲洗技术等,本文结合宁海电厂二期工程百万机组调试实际,具体介绍了宁电二期工程百万超超临界机组在调试过程中的节能、环保与技术创新。本文通过实践证明了其可行性与安全性,还分析了宁电二期百万机组工程在调试过程中取得的社会、经济效益,因而对国内同类型机组的调试创新具有参考和借鉴意义。
From the first domestic million tower-furnace plasma ignition to cryogenic EDTA cleaning, and large flow oxide skin flush teehnology, etc. Based on the power plant million units' debugging actual situation, Introduced the energy-saving, environmental protection and technology innovation of Ning Power Phase II project million uhra-supercritieal units in the commissioning process. Through the practice proves its feasibility and safety, and also analyzed the generator of social and economic benefits in commissioning process .Thus it has referenee and significance for the same type of domestic unit commissioning innovation.
出处
《神华科技》
2010年第6期91-93,共3页
Shenhua Science and Technology