期刊文献+

带时间窗约束的船体分段空间调度问题 被引量:9

Spatial scheduling problem with time window constraint for block assembly in shipbuilding
下载PDF
导出
摘要 研究了将空间资源作为关键资源的生产调度问题——空间调度问题,分析了空间调度问题和三维装箱问题的异同,以具有时间窗约束的空间调度三维模型为基础,提出改进的基于极点的启发式定位规则,给出结合禁忌搜索和基于极点的定位规则的优化算法,并通过仿真验证了算法的有效性。 Spatial scheduling problem as key resource scheduling problem was studied.Differences between spatial scheduling problem and three-Dimensional Bin Packing Problem(3D-BPP) were compared.Based on 3D spatial scheduling with time window as constraint,an improved heuristic positioning rules based on Extreme Points(EP) was proposed.Optimization algorithm based on tabu search and EP-based positioning rules was presented.Finally,a simulation experiment was provided to illustrate the effectiveness of the proposed approach.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第12期2674-2679,共6页 Computer Integrated Manufacturing Systems
基金 上海外高桥造船有限公司资助项目~~
关键词 空间调度 时间窗约束 三维装箱问题 极点 禁忌搜索 船舶建造 spatial scheduling time window constraint three-dimensional bin packing problem extreme points tabu search shipbuilding
  • 相关文献

参考文献11

  • 1LEE K J,LEE J K,CHOI S Y.A spatial scheduling system and its application to shipbuildings DAS-CURVE[J].Expert System with Application,1996,10(3/4):311-324.
  • 2PARK K,LEE K,PARK S,et al.Modeling and solving the spatial block scheduling problem in a shipbuilding company[J].Computer Industrial Engineering,1996,30(3):357-364.
  • 3RAJ P,SRIVASTAVA R.Solving spatial scheduling problem:an analytical approach[C] //Proceeding of the 37th International Conference on Computers and Industrial Engineering.Cairo,Egypt:Cairo University Elearning Centre,2007:2002-2011.
  • 4李波,王秀峰,赵志彦.一种基于遗传算法的最优空间布置方法[J].系统仿真学报,2004,16(8):1845-1848. 被引量:6
  • 5MARTELLO S,PISINGER D,VIGO D.The three-dimensional bin packing problem[J].Operation Research,2000,48(2):256-267.
  • 6FAINA L.A global optimization algorithm for the three-dimensional packing problem[J].European Journal of Operational Research,2000,126(2):340-354.
  • 7CRAINIC T,PERBOLI G,TADEI R.Extreme point-based heuristics for three-dimensional bin packing[J].INFORM Journal on Computing,2008,20(3):368-384.
  • 8郑俊丽,陈峰,江志斌,陈强.缩短最大完工时间的船舶分段空间调度算法[J].上海交通大学学报,2009,43(4):663-668. 被引量:11
  • 9CRAINIC T,PERBOLI G,TADEI R.TS2PACK:a two-level tabu serch for the three-dimensional bin packing problem[J].European Journal of Operational Research,2009,195(3):744-760.
  • 10张璎,蒋祖华.船舶曲型分段生产计算机辅助工艺设计技术研究[J].计算机集成制造系统,2006,12(3):346-351. 被引量:4

二级参考文献27

  • 1刘滨,蒋祖华.改进的Parks聚类分析距离算法[J].华东船舶工业学院学报,2004,18(4):51-57. 被引量:4
  • 2Park C, Chung K H, Park J C, etal. A spatial scheduling application at the block paint shop in shipbuilding:The HYPOS project[J]. Production Planning & Control, 2002, 13(4) :342-354.
  • 3Sung C S, Choung Y I. Minimizing makespan on a single burn-in oven in semiconductor manufacturing[J]. European Journal of Operational Research, 2000, 120 : 559 -574.
  • 4Park K, Lee K, Park S, et al. Modeling and solving the spatial block scheduling problem in a shipbuildingcompany[J]. Computer ind Engng, 1996, 30 (3): 357- 364.
  • 5Li B, Zhao Y Z, Li J D. A hybrid algorithm for nesting problems[C]//Proceedings of the Second Interna- tional Conference on Machine Learning and Cybernetics. Xi'an: IEEE, 2003: 1424-1429.
  • 6JooM H, Choi H R, Ryu K R, etal. A curve block assembly schedule in shipbuildings using constraint relaxation method[C]//Proeeedings of the Fall 98 Conference of the KESS. Korean: Korean Expert System Society, 1998: 285-292.
  • 7Koh S G, Park J C, Choi Y S, etal. Development of a block assembly scheduling system for shipbuilding company[J]. IE Interfaces, 1999, 12(4): 586-594.
  • 8Kyoung J L. Sufficient search space for spatial expert systems[J]. Expert Systems with Applications, 2000, 19 .. 1-8.
  • 9Li B, Zhao Y Z, Li G. A dynamic scheduling method for spatial layout planning [C]//Proceedings of the Fourth International Conference on Machine Learning and Cybernetics. Guangzhou:IEEE, 2005: 3612- 3617.
  • 10Ranjan V, Duck Y Y. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm[C]//2005 3rd IEEE International Conference on Industrial Informatics. Indin.. IEEE, 2005: 444- 449.

共引文献35

同被引文献64

  • 1郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 2李小君,潘丽君.基于可视图和几何逼近算法的避障路径动态规划研究[J].装甲兵工程学院学报,2007,21(2):29-32. 被引量:4
  • 3LEE K J, LEE J K, CHOI S Y . A spatial scheduling system and its application to shipbuilding: DAS-CURVE [J]. Expert Systems with Applications, 1996,10 (3/4) :311-324.
  • 4KOH S H, JANG J. GA hased spatial scheduling algorithm for mega-block assembly yard in shipbuilding company[C]// Proceedings of the 9th Asia Pacific Industrial Engineering Management Systems Conlerence. Bali, Indonesia: APIEMS, 2008,3-5.
  • 5KIM H M, KANG J H, PARK S S. Scheduling of shipyard block assembly process using constraint satisfaction problem [J]. Asia Pacific Management Review, 2002, 7(1): 119-138.
  • 6LOZANO-PEREZ P. Spatial planning: a configuration space approach [J]. IEEE Transactions on Computers, 1983, 32 (2) : 108-120.
  • 7RAJ P, SRIVASTAVA R K. Analytical and heuristic approa ches for solving the spatial scheduling problem[ C]//Proceed- ings of 2007 IEEE International Conference on Industrial Engi neering Management. Washington, D. C., USA: IEEE, 2007,1093-1097.
  • 8STEWART J. The evolution of genetic cognition[J].Journal of Social and Evolutionary Systems, 1997,20 ( 1 ) : 53-73.
  • 9SRINIVAS M, PATNAIK L M. Adaptive probabilities of crossover and mutation in genetic algorithms [J]. IEEE Transactions on SMC, 1994, 24 (4) :656-667.
  • 10XIAO Renbin, XU Yichun, AMOS M. Two hybrid compac- tion algorithms for the layout optimization problem[J]. Bio- systems, 2007,90(2) : 560-567.

引证文献9

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部