摘要
针对GF1型氧化铝罐车出料系统存在的积料、卸料不畅等问题,提出流化床结构改进方案,取得了良好效果,满足了生产需要。
Based on the problems of poor material deposit and discharge existing in GF1 alumina powder tank car,the improvement scheme for structure of fluidized bed was put forward,it achieved better effect and met the demand of production.
出处
《有色设备》
2010年第6期40-42,共3页
Nonferrous Metallurgical Equipment
关键词
氧化铝
罐车
流化床
alumina
tank car
fluidized bed