摘要
简要介绍了广东省高州市府前路南段挂榜岭隧道的设计与施工概况。该隧道于1997 年10月动工,至1999 年4 月完成一期工程右洞的建设。该隧道埋深浅,所处地质条件差,围岩非常软弱,且根据实际需要,隧道跨度要求较大。
The design and construction situation of Guabanling tunnel,which is part of the extension project of Fuqian Road Gaozhou city in Guangdong province,is generally introduced in this paper.This tunnel start to construct in October 1997,and have been completely constructed it's first project-right tunnel in April 1999.The tunnel has shallow cover,bad geology and weak surrounding rock,and according the actual needing,large span is asked.The complete construction of the tunnel is a successful application of new Austria Tunneling Method in weak rock,shallow cover and large span tunnel.
出处
《西部探矿工程》
CAS
1999年第6期40-42,共3页
West-China Exploration Engineering