Progress of HIRFL-CSR Project in 2004

Progress of HIRFL-CSR Project in 2004
下载PDF
导出
摘要 Considerable progress of HIRFL-CSR project was achieved in 2004. Up to now, about 98% of the total components have been completed, tested and installed. The injection beam line to CSRm has been commissioned by using different ion species. The first first-turn commissioning of CSRm has been successfully done. Considerable progress of HIILFL-CSP~ project was achieved in 2004. Up to now, about 98% of the total components have been completed, tested and installed. The injection beam line to CSRm has been commissioned by using different ion species. The first first-turn commissioning of CSRm has been successfully done.
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2004年第1期143-143,共1页 IMP & HIRFL Annual Report