摘要 In 2005, the commissioning totally 60 days for the CSR main ring was performed, the first-turn and stored C6+ beam (with lifetime more than 10 s) in the CSRm were achieved with≈7 MeV/u 12C4+ as the injection beam. Many technical progresses have been made before realizing the storage of ion beam, such as the control of magnet power supplies, the improve- In 2005, the commissioning totally 60 days for the CSR main ring was performed, the first-turn and stored C^6+ beam (with lifetime more than 10 s) in the CSRm were achieved with ≈ MeV/u ^12C^4+ as the injection beam. Many technical progresses have been made before realizing the storage of ion beam, such as the control of magnet power supplies,
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2005年第1期I0009-I0010,共2页 IMP & HIRFL Annual Report