First Plasma and Commissioning Results of LAPECR2

First Plasma and Commissioning Results of LAPECR2
下载PDF
导出
摘要 The all permanent ECR (Electron Cyclotron Resonance) ion source LAPECR2 was successfully mounted on the 320 kV HV platform at the beginning of 2005. In March, the plasma chamber, the injection vacuum pumping tubes and the extraction diagnostic chamber were successfully installed on the source and LAEECR2 was then connected to the successive ion beam test bench. The picture of LAPECR2 on the HV platform is given in Fig. 1. The all permanent ECR (Electron Cyclotron Resonance) ion source LAPECR2 was successfully mounted on the 320 kV HV platform at the beginning of 2005. In March, the plasma chamber, the injection vacuum pumping tubes and the extraction diagnostic chamber were successfully installed on the source and LAEECR2 was then connected to the successive ion beam test bench. The picture of LAPECR2 on the HV platform is given in Fig. 1.
出处 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 2005年第1期176-176,共1页 IMP & HIRFL Annual Report
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部