Primary Commissioning of Control System for HIRFL-CSRe Internal Target
Primary Commissioning of Control System for HIRFL-CSRe Internal Target
-
1Wang Yanyu Lin Feiyu Zhang Jianchuan Liu Wufeng.Hardware Designed for Control System of HIRFL-CSRe Internal Target Facility[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):220-220.
-
2Qiao Weimin Jing Lan.Computer Technique and Electronics--HIRFL-CSR Control System Progress[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):125-125.
-
3Li Zhankui and Xu Hushan.Pellet Target- a novel internal target at CSRm[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):175-176.
-
4Li Zhankui and Xu Hushan.Estimated Maximum Luminosity for Pellet Internal Target at CSRm[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):174-175.
-
5YIN Meng,GUAN Feng-ping,SONG Guo-fang,LV Yin-long,XING Jian-sheng,CUI Bai-yue.Design of the Internal Target of 10 MeV Medical Cyclotron[J].Annual Report of China Institute of Atomic Energy,2012(1):40-41.
-
6王彦瑜,林飞宇,张建川,刘伍丰,肖文君,邵曹杰.兰州重离子加速器团簇内靶装置控制系统设计[J].原子核物理评论,2010,27(4):464-468. 被引量:1
-
7Yu Deyang Xue Yingli Shao Caojie Song Zhangyong Lu Rongchun Ruan Fangang Wang Wei Chen Jin Yang Bian Cai Xiaohong.Radiative Electron Capture Collisions at HIRFL-CSRe in 200 MeV/u Xe54+-N2 Internal Target[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):208-208.
-
8李侃.PXI在兰州重离子加速器——冷却存储环控制系统的应用[J].自动化信息,2004(8):54-55.
-
9Yan Huaihai, Gao Daqing and Zhang Xianlai.Design of DC Power Supply Controller[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):160-161.
-
10肖文君,敬岚,王彦瑜,乔卫民,张建川,邵曹杰.重离子加速器实验环内靶控制系统[J].强激光与粒子束,2011,23(10):2747-2751. 被引量:1