期刊文献+

我国矿区土地复垦保证金类型及形式初步设计 被引量:4

Preliminary Design of the Types and Forms of Mine Land reclamation Bonds in China
原文传递
导出
摘要 我国矿区土地复垦保证金的类型和形式单一,直接影响了保证金制度的激励强度和效果。对中美矿区土地复垦保证金的类型及形式进行了对比分析,在此基础上对我国矿区土地复垦保证金的类型与形式进行了初步设计:小矿山适用全程保证金,中等矿山适用增量型保证金,大型及特大型矿山适用累积型保证金。矿区土地复垦保证金制度实施的初期阶段由矿山企业直接向管理机关提供现金形式的保证金;成熟阶段由银行、保险公司等金融机构向管理机关提供非现金形式的复垦担保;中期阶段则不同形式的保证金和两种担保渠道并存。 The types and forms of mine land reclamation bonds in China is very simplex. This affects the prompting intensity and effect of land reclamation bonds system directly. The contrast analysis of the types and forms of mine land reclamation bonds between the U. S. and China are made in this paper. The preliminary design the types and forms of land reclamation bonds for china's mines is made. Bonds for permit area are applied to small mines. Incremental bonds are applied to medium mines. Cumulative bonds are applied to large or super mines. In the initial stage of the implementation of land reclamation performance bonds system,the mines provide cash bond directly to the regulatory authority. In the mature stage,the financial institutions such as bank or insurance companies provide reclamation surety to the regulatory authority in non-cash form. In the middle stage,different forms of bonds and the two assurance channels exists at the same time.
出处 《矿业研究与开发》 CAS 北大核心 2010年第6期75-78,共4页 Mining Research and Development
基金 中央高校基本科研业务费专项资金项目(2009QD06)
关键词 矿区 土地复垦 保证金类型 初步设计 Mine area Land reclamation Bond type Preliminary Design
  • 相关文献

参考文献9

  • 1David Gerard. The Law and economics of reclamation bonds[ J]. Resources policy,2000,26 : 189 - 197.
  • 2Office of Surface Mining U. S. Handbook for Calculation of Rec- lamation Bond Amounts [ R]. Office of Surface Mining U. S, 2000.
  • 3Arbaras Webber, David J Webber. Promoting Economic Incen- tives for Environmental Protection in the Surface Mining Control and Reclamation Act of 1977 :An Analysis of the Design and Im- plementation of Reclamation Performance Bonds[ J]. Natural Re- sources Journal, 1985,25:389 - 414.
  • 4James Boyd. Financial Responsibility for Environmental Obliga- tions:Are Bonding and Assurance Rules Fulfilling Their Prom- ise? [ R]. Discussion Paper,2001,8:1 -42.
  • 5Helena McLeod. A Review of the Bond System in FIJI[ R]. Re- source Economist,SOPAC Technical Report,2000.
  • 6骆云中,谢德体.国外矿区土地复垦执行保证金制度的比较研究[J].西南农业大学学报(社会科学版),2003,1(4):1-4. 被引量:20
  • 7张凤麟.发达国家矿地复垦保证金制度及对中国的启示[J].中国矿业,2006,15(9):5-8. 被引量:32
  • 8国土资源部.2007年中国国土资源公报[EB/OL].http://www.mlr.gov.cn.2007.
  • 9朱玉立.关于完善我国小矿山管理的思考[J].西部资源,2007,0(5):16-18. 被引量:1

二级参考文献14

  • 1OECD 刘亚明(译).环境经济手段应用指南[M].北京:中国环境科学出版社,1994..
  • 2[2]PUBLIC LAW.95 -87 ,Surface Mining Control and Reclamation Act of 1977[S].
  • 3[3]James R. Kuipers, P E. Hardrock reclamation bonding practices in the western Unitied States[R]. National. wildlife federation, February 2000.
  • 4[4]Donna L. Erickson. Policies for the planning and reclamation of coal - mined landscapes: an international comparison [ J ]. Journal of environmental planning and management, 1995,38 (4).
  • 5[5]Costanza, Robert and Charles Perrings. A Flexible Assurance Bonding System for Improved Environmental Management[J]. Ecological Econo mics, 1990, 2.
  • 6[6]Perrings, Charles. Environmental Bonds and Environmental Research in Innovative Activities[ J ]. Ecological Economics, 1989, 1.
  • 7[7]Cochilco. Chilean Copper Commission.Research on Mine Closure Policy [R] , 2002.
  • 8State Mining and Geology Board,State of California.Surface Minging and Reclmation Act Financial Assurance Guidelines.
  • 9Financial Options for the Remediation of Mine Sites:a Preliminary Study,Minging Watch Canada,2001.7.6.
  • 10Australian and New Zealand Minerals and Energy Council,Minerals Council of Australia:Strategic Framework for Mine Closure,2000.

共引文献44

同被引文献95

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部