摘要 简要介绍了500 kV静安变电站主、辅设备情况,重点介绍了辅助控制系统配置组成、调试中暴露的问题及整改效果,完善、提高了辅助控制系统联锁报警、保护系统及自动控制系统的可靠性,确保了500 kV地下变电站的安全、可靠运行。 In this paper,the master equipments with their auxiliary devices in Jingan′s 500 kV transformer substation were briefly presented.The configuration of the auxiliary control system,the problems during debugging and the results after rectification was introduced in details.The reliabilities of the interlock alarm,system protection and automatic control system in the auxiliary control system were perfectly improved.Thus,this guaranteed the 500 kV underground transformer substation in a safe and reliable operation.
作者 陈旭
机构地区 上海闸北发电厂
出处 《华东电力》 北大核心 2010年第12期2002-2004,共3页 East China Electric Power
关键词 500KV地下变电站 辅助控制系统 调试 500 kV underground transformer substation auxiliary control system debugging