摘要
上海浦东联合广场深基坑施工中的监测工作,包括钢筋应力、测斜、地下水位和沉降位移等,由于实行信息化施工,达到了预定的要求,取得较好的社会效益和经济效益。文章介绍监测结果和监测工作中的一些体会。
The monitoring of the pit of the Lianhe Square includes stresses. deformation. the underground water level and the vertical displacement. Since the information construction method is adopted. the measured values agree with the predicted values. and good social and economic benefits are achieved. Some useful experiences are presented in this paper.
出处
《大坝观测与土工测试》
1999年第6期9-12,共4页
Dam Observation and Geotechnical Tests