对热电联产项目设计接口进行管理,是一种简单有效、可操作性强的管理方式,是提高热电联产项目综合设计质量的重要措施之一,值得建设方和设计单位注意。本文介绍热电联产项目在设计上的特点、设计接口的内容和要点、并提出设计接口管理措施。
Design interface management of Combined Heat and Power(CHP) project is worthy of drawing construction and design units' attention,with the character of simple,effective and highly operational.This paper covers the design feature of CHP project,as well as the content and key point of design interface.Management measures of design interface are also proposed.
出处
《电力勘测设计》
2010年第6期56-59,共4页
Electric Power Survey & Design
关键词
设计接口
建设方
设计合同
设计联络会
接口文件
design interface
construction unit
design contract
design liaison meeting
interface document.