4PIECHOWIAK T.Verification of pneumatic railway brake model[J].Vehicle System Dynamic,2010,48(3):283-299.
5WEI Wei,LIN Ye.Simulation of a freight train brake system with 120 valves[J].Proceeding of the Institution of Mechanical Engineers,Part F:Journal of Rail and Rapid Transit,2009,223(1):85-92.
6陆强.重载列车ECP制动系统方案设计及仿真研究[D].成都:西南交通大学,2009.
7Nasr A,Mohammadi S.The effects of train brake delay time on in-train forces[J].Proceedings of the Institution of Mechanical Engineers,Part F:Journal of Rail and Rapid Transit,2010,224:523-534.
8Zhai Wan-ming.Two simple fast integration methods for large-scale dynamic problem in engineering[J].International Journal for Numerical Methods in Engineering,1996,39(24):4199-4214.