摘要
为确保广西防城港核电厂前期及主体工程的顺利施工,根据《广西防城港核电厂前期一级进度计划》,结合项目现场实际情况,对防城港核电厂项目前期临时供水工程和施工正式供水工程的供水方案进行系统规划,并从现场用水需求、水资源调查、临时及主体施工用水方案规划、技术经济分析及存在的潜在风险等几方面进行了分析,并提出了具体的工作建议。
In order to ensure the smooth construction of prophase and main works of Guangxi Fangchenggang Nuclear Power Plant,this article works out a systematic plan for prophase temporary water supply and formal construction water supply in accordance with the Prophase 1st Level Schedule Plan of Guangxi Fangchenggang Nuclear Power Plant and practical conditions of the project.It provides suggestions in details through study on water demand at the site,water resource investigation,water utilization planning for construction of temporary and main works,technical and economic analysis,and potential risks.
出处
《红水河》
2010年第6期21-25,共5页
Hongshui River
关键词
施工
供水
规划
方案
防城港核电厂
construction
water supply
planning
scheme
Fangchenggang Nuclear Power Plant