摘要
结合印度京德10×135MW工程的印度锅炉规范(Indian Boiler Regulation,简称IBR)审核过程,介绍IBR及其对电厂设计的相关要求;分析IBR审核资料中的重点问题,根据10×135MW工程IBR审核的特点,对设计院开展IBR审核工作提出建议。
Through combining the review process of Indian Boiler Regulation(IBR) in 10 135 MW project of Jindal,the paper presents IBR and its requirements on power plant design.It analyzes key problems in verification materials of IBR and makes proposals concerning verification of IBR for design institute in light of characteristics of IBR's verification to 10×135 MW project.
出处
《广东电力》
2010年第12期63-64,88,共3页
Guangdong Electric Power
关键词
印度锅炉规范
审查流程
管道强度
管道应力
Indian Boiler Regulation
verification procedure
pipe intensity
pipe stress