7Garza M J esus , Prateapusanond Apirath , AmbaniNi- khil. Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract [ J]. Journal of Const ruction Engineering and Management , 2007,133( 11 ) :836-845.
7Householder L Jerry, Rutland E Hulan. Who Owns Float[J]. Journal of Construction Engineering Management, 1990,116(1) : 130-133.
8Sakka I Zafer, EI-Sayegh M Sameh. Float Consumption Impact on Cost and Schedule in the Construction Industry[J].Journal of Construction Engineering and Management,2007,133(2):124-130.
9Garza M Jesus, Prateapusanond Apirath, Ambani Nikhil. Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract[J]. Journal of Construction Engineering and Management,2007,133(11) :836-845.