期刊文献+

公伯峡水电站导流洞安全监测分析评价 被引量:1

Analysis and Evaluation on the Diversion Tunnel Monitoring of Gongboxia Hydropower Station
下载PDF
导出
摘要 公伯峡水电站导流洞下闸蓄水1个月后对导流洞导0+159 m-导0+214 m段进行了封堵,但导流洞导0+214 m下游段改建为右岸旋流式泄洪洞下平洞段的漩流洞、水垫塘和退水洞,为此导流洞导0+214 m以下洞身段安全运行直接影响右岸泄洪洞泄洪。文章对公伯峡水电站导流洞导0+214 m以下洞身4个监测断面监测资料进行全面分析、研究,评价其运行性态。 The blocking of section 0 + 159 m - 1. 0 + 214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound. However, the downstream of the section 0 + 214 m has been changed into the right bank of cyclone spillway section under the adit, the swirling flow of holes, water plunge pool and the back water tunnel. So, the security of the sections down the section 0 + 214 m directly affects flood discharge of the barilleri. This paper will have a comprehensive analysis, research, and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0 +214 m diversion tunnel.
出处 《四川理工学院学报(自然科学版)》 CAS 2011年第1期18-21,共4页 Journal of Sichuan University of Science & Engineering(Natural Science Edition)
关键词 公伯峡水电站 导流洞 监测资料 Gongboxia Hydropower Station diversion tunnel monitoring data
  • 相关文献

参考文献3

二级参考文献8

共引文献65

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部