摘要
分别介绍了盾构掘进姿态控制内容及影响因素,着重阐述了在盾构掘进时采取的各种保证盾构姿态措施,以确保隧道成型后与设计轴线的偏差控制在允许范围之内。
This article respectively illustrates the controlling content and influential factors for shield tunneling stance, mainly describes various shield tunneling stance measures to guarantee that the deviations of the design axis line are in the permitted domain after the tunnel forming.
出处
《山西建筑》
2011年第7期150-151,共2页
Shanxi Architecture
关键词
土压平衡盾构
盾构姿态
姿态控制
earth balance shield, shield stance, stance control