摘要
详细介绍了某铁路框构桥顶进设备安装、试顶、顶进前准备及顶进施工技术,分析了线路恢复的方案,为今后同类框构涵工程施工提供了宝贵经验。
This paper specifically introduces the railway frame bridge jacking equipment installation, jacking trying, preparation for jacking, and jacking construction technology, and analyzes the line availability program, which ahs provided valuable experience for future similar frame bridge engineering construction.
出处
《山西建筑》
2011年第7期169-170,共2页
Shanxi Architecture
关键词
框构涵
顶进施工
线路恢复
frame bridge, jacking construction, line availability