摘要 用电弧炉和AOD双联冶炼核电站主管道Z3CN2009M,并根据Shaefler图计算结果调整Z3CN2009M的铁素体含量。在离心铸管工艺中,用加大型筒壁厚、减小档板内孔直径、选大的重力加速度g值、增加内孔加工余量等措施铸造出主管道样件。测试结果表明,主管道样件各项性能指标均满足RCCM的要求。 Primary piping steel of Z3CN20 09M for nuclear power plant is melted by combination of electric furnace and AOD furnace,ferrite content of Z3CN20 09M are adjusted based on the compute result of Scharffler.Measures by enlarging the wall thickness of shell,decreasing inside diameter of the baffle,selecting greater g value and increasing machining allowances of internal surface,etc,in centrifugal casting process,sample of primary piping are casted.Measure results show that various performance of sample of primary piping the needs of RCC M are without exception meet.
作者 曾正涛 陈勇
机构地区 四川化工机械厂
出处 《核动力工程》 EI CAS CSCD 北大核心 1999年第4期357-359,共3页 Nuclear Power Engineering
关键词 压水堆 核电站 主管道 铸造 不锈钢管 PWR Nuclear power plant Primary piping Casting Duplex smelt
  • 相关文献

参考文献1

  • 1AFCEN 压水堆核岛机械设备设计和建造规则 M3402 M3406,1988年

同被引文献38

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部