摘要
介绍华能日照电厂680 MW超临界机组启动系统,分析无炉水循环泵开机的可行性,对成功开机全过程进行介绍,对机组启动的安全性和经济性进行总结。
The paper introduces the 680MW supercritical units start-up system in Huaneng Rizhao Power Plant,analyze the feasibility of start-up without boiler circulating water pump,the description of successful start-up process,summarize the reliability and economical efficiency of units start-up.
出处
《山东电力技术》
2011年第1期61-64,共4页
Shandong Electric Power
关键词
超临界机组
无炉水循环泵
开机
supercritical units
without boiler circulating water pump
units start-up